Ojibway Drive Update
Ojibway Drive Update
May 3, 2024
Attached is a drawing from Steve Young explaining the chipper pads on Ojibway Drive. These pads are needed to ensure that the chipper and truck can get off the road and loaded safely. These wider areas are placed approximately every 1km along the road on both sides of the road. All work areas are flagged with pink ribbons. It will be 15-20 meters wide all along the road, and wider for the ship pads at every 1km.